George
Guest





PostPosted: Wed Jun 13, 2007 9:19 am    Post subject: Computer glitches impact station attitude control Reply with quote

http://www.spaceflightnow.com/shuttle/sts117/070612cmgs/

BY WILLIAM HARWOOD
Posted: June 12, 2007

A Russian navigation computer aboard the international space station hung
up today, triggering a chain reaction of computer miscues in the midst of
work to unfurl two huge new solar blankets.

The arrays were successfully deployed, but the computer glitches forced
flight controllers to maintain the station's orientation using shuttle
rocket thrusters instead of the lab's stabilizing gyroscopes. That, in
turn, resulted in a less-than-desirable attitude and a loss of solar power
from a left-side array, which could not properly track the sun. Work to
reboot the Russian computers also apparently triggered a false fire alarm
that briefly prompted concern on the ground.

Late today, flight controllers at the Johnson Space Center in Houston came
up with an untried technique for switching orientation control back to the
station's control moment gyroscopes without going through the Russian
command-and-control computers. The gyroscopes can safely control the
station's orientation to maximize power generation without the stress,
strains and exhaust plume contamination that goes with using rocket
thrusters.

But moments after switching back to the gyros, an alarm sounded and flight
controllers asked shuttle commander Rick Sturckow to re-enable Atlantis'
digital autopilot once again while engineers worked on an alternative
approach.

"Our attempt to take attitude control obviously didn't work," astronaut
Megan McArthur radioed from Houston. "We'll be working on a secondary plan
and will get you words as soon as we have a plan."

Joel Montalbano, a mission operations manager at the Johnson Space Center,
said Atlantis had plenty of rocket fuel and, in a worst-case scenario,
could maintain the orientation of the combined vehicles for a full week if
necessary.

But engineers were confident it wouldn't come to that and by 9 p.m., they
had successfully re-established gyroscope control and the left-side array
was tracking the sun as required.

Computer glitches aside, program managers were thrilled with the successful
deployment of the new S3/S4 solar arrays on the right side of the space
station's main power truss.

"As a program guy, I'd be remiss if I didn't tell you what these solar
arrays mean to us," said Mike Suffredini, NASA's space station program
manager at the Johnson Space Center in Houston. "This set of solar arrays
will provide about 20 kilowatts of power to the international space
station. That's useable power. It provides quite a bit more than that, but
some of it is siphoned off to take care of its own systems.

"That equates to something like eight to 10 households," he said. "So it's
a significant amount of power we bring to the space station now. In
addition to that, it's going to allow us to take our next steps, which
begin early tomorrow morning and that'll be the retraction of the 2B
array."

The station's power system includes four sets of solar arrays, two on each
end of a truss that eventually will stretch more than 300 feet from tip to
tip. A set of arrays known as P4 was added to the left side of the truss
last September and the Atlantis astronauts added the S4 arrays that were
unfurled on the starboard side of the truss today.

A third array - P6 - was launched in 2000 to provide power during the early
stages of construction. NASA plans to move P6 to the left end of the power
truss later this year. One of its two solar wings - P6-4B - was retracted
during a shuttle flight last December. The other wing - P6-2B - is
scheduled for retraction this week.

But the December shuttle crew ran into major problems retracting P6-4B and
ultimately had to stage an unplanned spacewalk to coax the blankets back
into their canister.

This time around, the astronauts plan a slower, more deliberate approach,
giving the array more time to settle out between retraction attempts in a
bid to ensure the blankets fold smoothly. If they don't, astronauts Patrick
Forrester and Steve Swanson will provide manual assistance at the start of
a planned six-and-a-half-hour spacewalk. The primary goal of the excursion
is to complete the activation of a rotary joint designed to keep the new S4
arrays face-on to the sun.

Back at the Johnson Space Center, engineers are testing different
techniques for securing a pulled-up insulation blanket on Atlantis'
left-side Orbital Maneuvering System rocket pod that was spotted after
launch Friday. The shuttle crew's mission has been extended two days and a
fourth spacewalk added to allow time for repairs.

John Shannon, chairman of NASA's Mission Management Team, said today he has
not yet decided which repair technique to use or even when to use it,
holding open the options of attempting the blanket repair during the third
spacewalk Friday or deferring it to a fourth and final excursion Sunday.

One technique calls for a spacewalking astronaut on the end of the
shuttle's 50-foot-long robot arm to push the blanket corner down and sew it
to an adjacent blanket using steel thread. Another technique calls for the
astronaut to use a surgical stapler to secure the blanket. Another option
is to simply push the blanket down and leave it at that.

Shannon said tests will be conducted overnight in a wind tunnel in
California and furnaces at the Johnson Space Center to see which repair
technique holds up best in the re-entry environment.

Otherwise, Shannon said, the shuttle's heat shield appears to be in good
condition. Engineers are still assessing post-launch "spikes" in data from
wing leading edge impact sensors on the shuttle's left and right wings.

"Last night, there was a one-G indication on our wing leading edge impact
detection system," he said. "Last night it was the sensor between the right
(wing) panels 11 and 12. The day before we got a one- half-G reading on the
sensor between left panel 7 and 8.

"On previous flights, we've had several indications exactly the same. We
don't exactly understand what is going on. We think we're getting some
thermal settling, or thermal deformation of the support structure to the
wing leading edge. People don't feel like it was an impact because no other
sensors around that area pick it up. There's no ringing of the structure at
all, just kind of a little click."

After Atlantis undocks from the space station next week, the astronauts
will conduct a now-standard "late" inspection of the shuttle's heat shield
"and if there were anything in those areas we would pick it up," Shannon
said.
Back to top
  Ads
Advertising
Sponsor


John Doe
Guest





PostPosted: Wed Jun 13, 2007 10:24 am    Post subject: Re: Computer glitches impact station attitude control Reply with quote

George wrote:
Quote:
The arrays were successfully deployed, but the computer glitches forced
flight controllers to maintain the station's orientation using shuttle
rocket thrusters instead of the lab's stabilizing gyroscopes. That, in
turn, resulted in a less-than-desirable attitude and a loss of solar power
from a left-side array, which could not properly track the sun. Work to
reboot the Russian computers also apparently triggered a false fire alarm
that briefly prompted concern on the ground.

Interesting reporting. I was under the apparently false impression that
during docked operations, the shuttle had responsability for attitude
control. Secondly, I was under the impression that during normal times,
it was now the US segment in charge of attitude control with a
connection the russian systems as backup and for CGM desaturation
manoeuvers.

Of course, this doesn't beat BBC that said that the very old shuttle
went up there to REPAIR solar arrays.
Back to top
  Ads
Advertising
Sponsor


Display posts from previous:   
Post new topic   Reply to topic    Defense Industry Forum Index -> Defense Industry All times are GMT
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum

Australian Debt Consolidation Experts
medical insurance
Wedding Website
Search Escorts and girls (incall/OutCall) online with Oasi2000, ItaliaChiamami, BestAnnunci...
Swingers in Germany
Link Sales Talk
life insurance
Make Your Own Website
Cheap phone calls to UAE
Cleaning Service
mold killer
UK Swingers Genuine Contacts Site
Dir All
medical office supplies
Webcams
Vacuum Bags


Board Security

97 Attacks blocked

Powered by phpBB © 2001, 2005 phpBB Group